Bioretention
Cornerstone
5/19/2025
Chandler Park Dr from Canyon Ave to Gateshead St
NeighborhoodCornerstone Village
Practice Type
Project DescriptionThe stormwater management practice along Chandler Park drive will contribute to runoff reduction. Construct of bioretention cells mirroring the natural landscape with a shallow grass swale in the planting strip between the sidewalk and road was installed at this location. The use of curb cut inlets and trench drains was installed for this practice.
Project Details
Received Drainage CreditNo
Maximum Depth4.00 ft
Acres Managed1.18 Acres
Million Gallons Managed Annually0.89 million gallons